CWBSP practice test can be your optimum selection and useful tool to deal with the urgent challenge. With over a decade’s striving, our CWBSP training materials have become the most widely-lauded and much-anticipated products in industry. We will look to build up R&D capacity by modernizing innovation mechanisms and fostering a strong pool of professionals. Therefore, rest assured of full technical support from our professional elites in planning and designing CWBSP Practice Test.
Topic | Details |
---|---|
Topic 1 |
|
Topic 2 |
|
Topic 3 |
|
Topic 4 |
|
With the high class operation system, we can assure you that you can start to prepare for the CWBSP exam with our study materials only 5 to 10 minutes after payment since our advanced operation system will send the CWBSP exam torrent to your email address automatically as soon as possible after payment. Most important of all, as long as we have compiled a new version of the CWBSP Guide Torrent, we will send the latest version of our CWBSP training materials to our customers for free during the whole year after purchasing. We will continue to bring you integrated CWBSP guide torrent to the demanding of the ever-renewing exam, which will be of great significance for you to keep pace with the times.
NEW QUESTION # 67
What is the minimum calculated design area for a light hazard sprinkler system protecting an open office space with a noncombustible acoustic ceiling tile installed 6 in. (150 mm) below the bottom of solid wood joists?
Answer: C
Explanation:
For a light hazard occupancy like an open office space with a noncombustible ceiling, NFPA 13 typically requires a minimum calculated design area of 1,500 ft². This accounts for the lower fireload and the effective coverage of sprinklers in such environments.
References: NFPA 13 design criteria for light hazard occupancies, which specify the minimum design areas for sprinkler systems based on occupancy type and ceiling configuration.
NEW QUESTION # 68
High piled storage includes all storage of Group A plastic in excess of what height?
Answer: A
Explanation:
High piled storage of Group A plastics is typically considered to be any storage in excess of 12 feet (3.7 meters). This height threshold is set to account for the increased fire risk and challenges associated with higher stacks of combustible materials.
References: NFPA 13 and related standards provide guidelines for high piled storage, including height thresholds for different materials to ensure appropriate fire protection measures are applied.
NEW QUESTION # 69
A fire pump must produce at least what percentage of its rated pressure at the 150% flow condition?
Answer: B
Explanation:
A fire pump must produce at least 65% of its rated pressure at the 150% flow condition. This requirement ensures that the pump can still maintain a significant portion of its pressure even when operating beyond its rated capacity, providing a margin of safety.
References: NFPA 20 sets the standards for the installation of stationary pumps for fire protection, including performance requirements at various flow conditions.
NEW QUESTION # 70
In areas using HVLS fans, where must the fans be located in regards to sprinkler placement?
Answer: D
Explanation:
According to NFPA 13, HVLS fans shall be centered approximately between four adjacent sprinklers to avoid interference with the sprinkler discharge pattern and to provide adequate clearance from the sprinkler deflectors. This requirement applies to both standard and ESFR sprinklers, and the fans shall be interlocked to shut down immediately upon a waterflow alarm.
References: NFPA 13, 2019 edition, section 11.1.71; NFPA 13 Handbook, 2019 edition, section 11.1.72; NFPA 13 Guidelines for Placing HVLS Fans in Sprinkler Protected Buildings; HVLS Fans and Fire Sprinklers
NEW QUESTION # 71
According to NFPA 13, for a high rise building sprinklered throughout, that has four stairwells, each with a standpipe and hose valves, and has a Class I standpipe system, what is the maximum flow rate required to be calculated?
Answer: D
Explanation:
For a high-rise building sprinklered throughout with four stairwells each having a Class I standpipe system, the maximum flow rate required to be calculated is typically 1,000 gpm (3,785 L/min). This accounts for the demand of both the standpipe system and the sprinkler system in a combined scenario.
References: NFPA 14 sets the standard for the installation of standpipe and hose systems, and it specifies the minimum flow rates required based on the number of standpipes and the type of building occupancy.
NEW QUESTION # 72
......
Our Software version has the advantage of simulating the real CWBSP exam environment. Many candidates can’t successfully pass their real exams for the reason that they are too nervous to performance rightly as they do the practices. This Software version of CWBSP practice materials will exactly help overcome their psychological fear. So you will be bound to pass your CWBSP exam since you have perfected yourself in taking the CWBSP exam with full confidence.